NW Natural Pipeline Installation CX(s) Applied: B4.9Date: 08/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Agricultural Lease Renewal at Parkdale Substation CX(s) Applied: B4.9Date: 42542 Location(s): OregonOffices(s): Bonneville Power Administration
Land Use Agreement for Driveway Expansion in the Ross-Lexington Transmission Line Corridor CX(s) Applied: B4.9Date: 42529 Location(s): WashingtonOffices(s): Bonneville Power Administration
Green Crow Logging Road-LURR 20140527 CX(s) Applied: B4.9Date: 05/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
ELI Fiber Splicing Project at Salem Substation CX(s) Applied: B4.9Date: 04/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Wolf Point Substation Easement Outgrant CX(s) Applied: B4.9Date: 04/06/2016 Location(s): MontanaOffices(s): Western Area Power Administration-Upper Great Plains Region
Installation of Metering Equipment near North Bench and Bonners Ferry Substations CX(s) Applied: B4.9Date: 04/01/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Edgeley Groton 115 Kilovolt Transmission Line Relocation CX(s) Applied: B4.9, B4.13Date: 03/31/2016 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Categorical Exclusion Determination
Temporary Staging and Parking in Keeler-Oregon City No. 2 Right-of-way CX(s) Applied: B4.9Date: 12/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration