Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace Structures 0/1 to 2/7 on its West Portal-Stillwater Tap …
Synthesize and evaluate an amine based air capture adsorbent. This involves laboratory-scale research.…
Purpose: To ensure the safety and reliability of the bulk electric system.…
Bonneville Power Administration (BPA) proposes to partially compensate Puget Sound Energy (PSE) to bury approximately 230 feet of overhead electric…
Replace the existing wood structures with galvanized steel structures and replace the conductor, shield wire and grounding and associated transmiss…
Support DOE GMD and EMP goals in the area of GMD protection. Purchase and install a GIC neutral blocking device at Weakley substation in the 500 kV…
Substation modifications, installation, and testing the grid-ready flexible transformer, GRFT, prototype at Cooperative Energy’s Columbia Substatio…
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
BPA proposes to remove deteriorating wood decks, stairways, and gutters, replacing them with like for like in-situ wood assemblies, and repairing …
DOE proposes to install electrical power backup capability at LBNL’s switch station SW-A6 as a temporary pilot project.…