Bonneville Power Administration (BPA) proposes to install access restrictions to the Libby-Conkelley No. 1 transmission right-of-way (ROW) in line …
Bonneville Power Administration (BPA) proposes to replace and relocate existing potential transformers (PTs), modify an existing concrete footing, …
Bonneville Power Administration (BPA) proposes to replace two existing transmission line structures with new structures (Grand Coulee-Foster Creek …
The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argon…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
This revision adds new poles at CITRC on circuit 54. Poles will be: 54-26A-1, 54-9-4-3 and 54-9-4-4.…
This revision adds scope to revision 1 of the environmental checklist (EC). Power Management has identified additional power poles that need to be …
Design, manufacture & install on an electrical grid a 60 MVA flexible large power transformer (LPT). Also, R&D to improve protective relays and dis…
A survey of the 500kV Monroe-Custer No. 1 transmission line resulted in the identification of a Snohomish County PUD (SCPUD) distribution line that…
BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …