Bonneville Power Administration (BPA) proposes to install jumpers between the Benton Rural Electric Association (BREA) substation tap line and stru…
Bonneville Power Administration (BPA) proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipme…
Bonneville Power Administration (BPA) proposes to install a new series capacitor bank and associated switching and protective equipment at BPA’s Wa…
Bonneville Power Administration (BPA) proposes to allow ATT to upgrade existing long-term evolution (LTE) antenna equipment on existing transmissio…
Bonneville Power Administration (BPA) proposes to relocate a revenue meter and upgrade backup station service equipment at BPA’s North Bonneville S…
The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two fiber optic cables on the Hungry Horse-Columbia Falls No. 1 transmission line to take their place.
Bonneville Power Administration (BPA) proposes to replace an existing 230-kilovolt (kV) shunt capacitor group and associated switching and protective equipment at Longview Substation near Longview, Cowlitz County, Washington (Township 8 North, Range 3 East, Donation Land Claim 38).
Bonneville Power Administration (BPA) proposes to upgrade components of its Wendson Substation to increase equipment reliability and sustainability, providing operational flexibility that reduces the risk of outages to customers.
The US Department of Energy (DOE) proposes to perform assessment, modernization, and upgrade of the existing sitewide utility systems at the Lawren…
Bonneville Power Administration (BPA) is proposing to upgrade equipment at the following substations: Calpine, Coyote Springs, McNary, McNary Powerhouse, Pendleton, Ross, Roundup, Slatt, and Walla Walla.