Bonneville Power Administration (BPA) proposes to allow AT
BPA proposes to replace approximately 4.3 miles of existing fiber optic cable on its Snohomish-Bellingham fiber system along the Monroe-Custer No 1…
The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …
Bonneville Power Administration (BPA) proposes to install jumpers between the Benton Rural Electric Association (BREA) substation tap line and stru…
Bonneville Power Administration (BPA) proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipme…
Bonneville Power Administration (BPA) proposes to install a new series capacitor bank and associated switching and protective equipment at BPA’s Wa…
Bonneville Power Administration (BPA) proposes to allow ATT to upgrade existing long-term evolution (LTE) antenna equipment on existing transmissio…
Bonneville Power Administration (BPA) proposes to relocate a revenue meter and upgrade backup station service equipment at BPA’s North Bonneville S…
The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two fiber optic cables on the Hungry Horse-Columbia Falls No. 1 transmission line to take their place.
Bonneville Power Administration (BPA) proposes to replace an existing 230-kilovolt (kV) shunt capacitor group and associated switching and protective equipment at Longview Substation near Longview, Cowlitz County, Washington (Township 8 North, Range 3 East, Donation Land Claim 38).