Bonneville Power Administration (BPA) proposes to install a new 230-kilovolt (kV) switchable air core shunt reactor bank and associated switching a…
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades of the Advanced Light Source (ALS) switchstation A3 (…
Bonneville Power Administration (BPA) is proposing to install a new communications line to the Warren Substation power control assembly (PCA) build…
Bonneville Power Administration proposes to renovate and expand the Hazardous and Toxic Materials Handling Building (HMB) located at the J.D. Ross …
Bonneville Power Administration (BPA) proposes to fund electrical grounding installations along three parallel underground Seattle Public Utilities…
Bonneville Power Administration (BPA) proposes to install work safety fall protection equipment on its lattice-steel and tubular-steel electrical t…
Bonneville Power Administration proposes to upgrade the fiber optic cable and communications network located in the West Campus area of the J.D. Ro…
This project would support the previously completed Fairview Substation Reactor Addition and Containment Installation, which a Categorical Exclusio…
Bonneville Power Administration (BPA) proposes to install three new motor operated disconnect switches, a new bus configuration, and relaying equip…
BPA proposes to improve, reconstruct, and reroute a portion of the existing access road along the Lower Monumental-Ashe 500kV transmission line in …