The Power Management organization at Idaho National Laboratory (INL) must perform timely maintenance and inspection activities on power poles and s…
NATIONAL GRID 34.5KV REPLACEMENT PROJECT
BPA proposes to install two new breakers, associated electrical equipment, and new stormwater infrastructure at BPA’s Toledo Substation.…
The project will install new 96 strand single-mode fiber optic cable overhead from the CITRC substation to PBF-637 and PBF-638.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to complete a number of maintenance activities in the Seminoe area …
BPA proposes to secure the right-of-way (ROW) in this area and obstruct vehicular access by installing approximately 80 feet of chain link fencing …
The Y.Cube is a 1MW-30 minutes battery energy storage system (BESS) that would be installed and operated at building 300.…
BPA proposes to replace two switches with new switches that meet safety and quality standards.…
KESSELRING SITE HIGH YARD (HY) 30 UPGRADE PROJECT AND BUILDING 28 UNDERGROUND CONDUIT INSTALLATION PROJECT
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install a temporary structure on the Estes-Lyons (E-LS) 115-kV T…