U1a Modernization (U1a-M) is a multi-year set of activities and projects that would design and construct the necessary infrastructure and utilities…
Western Area Power Administration would rebuild 6.1 miles of the existing Coolidge to Valley Farms 115-kilovolt Transmission Line within the previo…
This revision to Environmental Checklist Idaho National Laboratory-18-110 covers construction of a metal building within disturbed area of the Obsi…
DOE at the Paducah Gaseous Diffusion Plant (PGDP) plans to design and construct a new electrical distribution system to bypass the C-531 Switchyard.
Categorical Exclusion Determination
Categorical Exclusion Determination
Award Number: DE-AC36-08GO28308CX(s) Applied: B4.11, B4.12, DOE/EA-1914NRELLocation(s): COOffice(s): Golden Field Office
Categorical Exclusion Determination
Mercury Modernization (MM) is a multi-year project that would redevelop a central area of the current Mercury town site to provide modern facilitie…
Categorical Exclusion Determination