Wray-Wray Tap 115-Kilovolt Transmission Line Construction CX(s) Applied: B4.12 Date: 02/28/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
33 MVA Electrical Power Substation Project - TJSO-SC-14-01 CX(s) Applied: B4.11, B4.12, B1.13 Date: 02/10/2014 Location(s): Virginia Offices(s): Thomas Jefferson Site Office
Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...
Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation CX(s) Applied: B4.12 Date: 06/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Recovery Act: Rural Electric Cooperative Geothermal Development CX(s) Applied: B4.12, B5.15 Date: 06/04/2013 Location(s): Oregon Offices(s): Golden Field Office
Sologen Geothermal Co-Production Field Demonstration CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15 Date: 12/13/2012 Location(s): Texas Offices(s): Golden Field Office
300 Area Electrical Service Project CX(s) Applied: B4.12 Date: 10/02/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Buried Power Line at Customer Operations Center CX(s) Applied: B1.3, B4.6, B4.12 Date: 06/08/2012 Location(s): Wyoming Offices(s): RMOTC
Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line ProjectCX(s) Applied: B4.12Date: 10/07/2011Location(s): Dayton, Columbia County, WashingtonOffice(s): Bonneville Power Administration