The U.S. Department of Energy (DOE) is proposing to provide federal funding to Ventura Energy Partners for the design and installation of a battery energy storage system (BESS) at the Forks of Butte Hydroelectric Generating Facility in Magalia, California.
Take a current section of primary electric service underground to provide better local electric service. The current overhead service runs close to…
East River Electric is building the Moody County Switching station on WAPA's Flandreau - Sioux Falls 115 Kv transmission line between structures 40…
Mercury Modernization (MM) is a multi-year project that would redevelop a central area of the current Mercury town site to provide modern facilitie…
The American Electric Power's (AEP's) Buckrun Switch to West Crawford 69 kV Transmission Line Rebuild Project will rebuild approximately 6.12 miles of existing linear transmission line infrastructure generally within its existing 60-foot-wide right-of-way (ROW) between the existing Blanchard Station and West Crawford Station (main line) and between the main line and South Vanlue Station, in Hancock and Wyandot counties, Ohio.
New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the reb…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Alaska Village Electric Cooperative (AVEC) for the installation …
The National Park Service proposes to reconstruct or replace existing utilities (electrical, water, gas, and communication) in new right-of-way (ROW) along State Road 4 in Technical Area (TA) 39 at Los Alamos National Laboratory (LANL).
East River Electric Power Cooperative (ERC) is upgrading the Arlington Tap facility on the WAPA Watertown - Brookings 115 kV transmission line. WAP…
Proposed project activities will making several critical infrastructure upgrades in areas prone to frequent outages, including substation upgrades,…