Categorical Exclusion Determinations: B4.12

This revision is for Oklo to install temporary power lines to the Aurora-INL project site, install a production well at the Aurora-INL site, and utilize an MFC construction water supply source to provide water to support Aurora-INL limited construction activities.
The Proposed Action includes a proposed powerline extension that would be partially located on U.S. Department of Energy/National Nuclear Security Administration property and partially located on Los Alamos County (LAC) property to provide reliable and redundant power.