The project includes WAPA temporarily re-routing a section of its Edgeley to Forman 69 kV transmission line that collapsed into TAD lake along the …
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform construction of electric powerlines approximately 10 miles in length …
A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to …
The Department of Energy is proposing to provide funding to the Nevada Governor’s Office of Energy for the development and installation of an appro…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No 2 230kV transmission line, between structures 66-3-6…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No. 2 230kV transmission line, between structures 66/3-…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to use an establish lay down yard to facilitate the Estes-Flatiron …
WAPA is proposing to rebuild the damaged structures in a location closer to the bridge and highway.…
The project proposes to gravel a large area near the northwest end of the runway and to pave (asphalt) a small gravel area near the steel building.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve an interconnection request from the Public Service Compa…