The project will reconfigure the plant power supply and distribution system to transition to a more adequately sized 138kV supply.…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…
The Mission Support Contractor (MSC) and its subcontractors perform construction of electric powerlines approximately 10 miles in length or less, o…
Revision 1 adds additional scope related to seismic testing. See uploaded file of EC. The proposed action performs site characterization studies to…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install a new secondary power feed to the U.S. Bureau of Reclama…
The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argon…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
The U.S. Department of Energy, Richland Operations Office, Infrastructure and Services Division proposes to remove and reroute portions of the 100 …
The Tennessee Valley Authority (TVA) is designing, constructing, and will be operating a new substation for the U.S. Department of Energy (DOE) at …
The proposed action performs site characterization studies to determine capability and suitability for locating a small modular reactor (SMR) on ab…