Categorical Exclusion Determinations: B4.12

Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation CX(s) Applied: B4.12 Date: 06/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Sologen Geothermal Co-Production Field Demonstration CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15 Date: 12/13/2012 Location(s): Texas Offices(s): Golden Field Office
Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line ProjectCX(s) Applied: B4.12Date: 10/07/2011Location(s): Dayton, Columbia County, WashingtonOffice(s): Bonneville Power Administration
Red Bluff Pumping Plant 6-kilovolt Interconnection ProjectCX(s) Applied: B4.12Date: 05/24/2011Location(s): Tehama County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region