Construction of new 46kV sub-transmission line for 2 City owned electrical substations. Installation of isolation switches in the 46kV sub-transmis…
Office of NEPA Policy and Compliance
October 28, 2024Construction of new 46kV sub-transmission line for 2 City owned electrical substations. Installation of isolation switches in the 46kV sub-transmission line.