Subcontractor Repair of Leaks in Room A-4 at 704-1N CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install) CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor Repair of Roof Leaks at 773-52A CX(s) Applied: B1.3 Date: 08/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Core Sampling of 703-A Roof CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leak on 730-B CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Curecanti-Lost Canyon 230-Kilovolt Emergency Repairs of Downed Conductor CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Kiowa Creek-Weld 115-Kilovolt Transmission Line Culvert Replacement CX(s) Applied: B1.3, B1.33 Date: 08/06/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Will Clean Out Gutters Causing Leaks in 706-N CX(s) Applied: B1.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office