Categorical Exclusion Determinations: B1.3

Kayenta-Navajo 230 Kilovolt Transmission Line Insulator Replacement Navajo County AZ CX(s) Applied: B1.3Date: 02/24/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region
Maintenance Clean the Big Hill Raw Water Intake Structure Pump Bay (GH-OM-1167) CX(s) Applied: B1.3Date: 02/23/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Pueblo Canyon Grade Control Structure Revitalization and Wetlands Stabilization, TA-74 CX(s) Applied: B1.3, B1.11, B1.13, B3.1, B6.1Date: 02/18/2015 Location(s): New MexicoOffices(s): Los Alamos Site Office
Record of Categorical Exclusion Determination to Replace Piping Header at Bryan Mound RWIS and RWIP (BM-MM-1027) CX(s) Applied: B1.3Date: 02/18/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office