Install Blank on Line WEE-3222 after 242016F Overheads CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacing HVAC systems in Six Facilities Across the Site CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Bell Substation HVAC Replacement CX(s) Applied: B1.3Date: 06/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
773-A, E004/008/131 Roof Replacement CX(s) Applied: B1.3Date: 06/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
St. Johns-St. Helens Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Dewatering and Impoundment Removal at 685-25G New Fire Pond CX(s) Applied: B1.3Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Capitol Peak Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Tenkiller Dam and Norfolk Substation Protective Relay and Control Switchboard Panel Replacements CX(s) Applied: B1.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration
Subcontractor Will Provide Roof Repairs at 789-2B CX(s) Applied: B1.3Date: 06/18/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office