Spearfish Tap Access Road Maintenance CX(s) Applied: B1.3Date: 42549 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 28, 2016Spearfish Tap Access Road Maintenance
CX(s) Applied: B1.3
Date: 42549
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to conduct minor maintenance on about 1 mile of access road within the existing road prism along the Spearfish Tap transmission line corridor