Subcontractor Will Provide Roof Repairs at 716-N CX(s) Applied: B1.3Date: 12/15/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repainting Portions of 902-1F and 902-2F Fire Water Storage Tanks CX(s) Applied: B1.3Date: 12/15/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
The scope of this Categorical Exclusion Determination under the National Environmental Policy Act of 1969 (NEPA) is limited to the Department of Energy determination of excess real property, coordination with the General Services Administration and other agencies and stakeholders, and other administrative activities to support the excess real property process.
Inhibited Water Header Drain Addition on Tank 11 and Tank 15 CX(s) Applied: B1.3Date: 12/11/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Removal of Leaked Normal Cooling Water (NCW) on 1st Level CX(s) Applied: B1.3Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-A, E-114 CX(s) Applied: B1.3Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
702-2A Heating, Ventilation, and Air Conditioning (HVAC) Installation CX(s) Applied: B1.3Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 238-H CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Reroute 221-S Gas Chromatograph Common Return Line per J-DCF-S-03003 CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Disposition of Empty Compressed Gas Cylinders Containing Instrument Calibration Gas CX(s) Applied: B1.3Date: 12/03/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office