Remove Flammable Gas Monitor CX(s) Applied: B1.3Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
The Fixed Length Transfer Jet in Tank 47 Will Be Removed and Used to Fabricate a New Spare Fixed Length Transfer Jet CX(s) Applied: B1.3Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Danger Tree Management on North Gunnison to Skito 115-kilovolt and Curecanti to Poncha 230-kilovolt Transmission Line Gunnison and Chaffee Counties, Colorado CX(s) Applied: B1.3Date: 11/14/2014 Location(s): ColoradoOffices(s): Western Area Power Admini...
Danger Tree Management on North Gunnison to Salida 115-kilovolt Transmission Lines and Gunnison and Chaffee Counties, Colorado CX(s) Applied: B1.3Date: 11/14/2014 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks 108-1K CX(s) Applied: B1.3 Date: 05/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Big Eddy-Redmond #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 41919 Location(s): OregonOffices(s): Bonneville Power Administration
Davis Creek Tap Wood Pole Replacements CX(s) Applied: B1.3Date: 41915 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Canby Tap to Malin-Hilltop #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 41915 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Malin-Hilltop Wood Pole Replacements CX(s) Applied: B1.3Date: 41915 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Pilot Butte-La Pine #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 41912 Location(s): OregonOffices(s): Bonneville Power Administration