Remove all coatings down to the original concrete floor in Room 16 of Building 705-N.…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Subcontractor will caulk 30 feet at parapet/expansion joint to stop leaks at Building 284-20H. The Subcontractor will disturb the existing roof…
Clean/vacuum precipitator hopper and extension auger. Wood ash will be delivered to Three Rivers Landfill under a special waste manifest. Rinse wa…
The north medium bay roll-up door on Building 717-F no longer functions. The north medium bay roll-up door will be replaced, including the door, do…
The men’s rest room has flooded and caused floor damage in Bathroom Trailer 704-73E requiring floor replacement for entire trailer. Construction wi…
Savannah River Tritium Enterprise and Savannah River National Laboratory have implemented Digital Imaging and Measurement System, which uses digita…
The Subcontractor will install one (1) 3" drain insert, flash dry drain insert in with one (1) 4' X 4' modified patch, and seal perimeter of patch…
The Subcontractor will re-attach all loose metal and replace screws with oversized screws. Repair entire perimeter, front and back with hydro-stop …
The Subcontractor will install new sheet metal flashing between roof eave and the awning, install new foam closure in the same location as the shee…