The men’s rest room has flooded and caused floor damage in Bathroom Trailer 704-73E requiring floor replacement for entire trailer. Construction will remove plumbing, then flooring, and inspect for further damage to subflooring and, if required, replace/repair sub flooring. New flooring will be installed and the trailer returned to service condition.