CX-019784: Repair Roof at Building 704-C

The Subcontractor will install one (1) 3" drain insert, flash dry drain insert in with one (1) 4' X 4' modified patch, and seal perimeter of patch…

Office of NEPA Policy and Compliance

February 13, 2019
minute read time

The Subcontractor will install one (1) 3" drain insert, flash dry drain insert in with one (1) 4' X 4' modified patch, and  seal perimeter of patch with cement and membrane to stop leaks at Building 704-C. The Subcontractor will not disturb the existing roof while performing these repairs.