The Subcontractor will install new sheet metal flashing between roof eave and the awning, install new foam closure in the same location as the shee…
Office of NEPA Policy and Compliance
February 13, 2019The Subcontractor will install new sheet metal flashing between roof eave and the awning, install new foam closure in the same location as the sheet metal flashing and caulk as needed to stop leaks at Building 714-2N. The Subcontractor will disturb the existing roof while performing these repairs.