CX-019780: Repair Roof at Building 284-20H

The Subcontractor will caulk 30 feet at parapet/expansion joint to stop leaks at Building 284-20H. The Subcontractor will disturb the existing roof…

Office of NEPA Policy and Compliance

February 13, 2019
minute read time

The Subcontractor will caulk 30 feet at parapet/expansion joint to stop leaks at Building 284-20H. The Subcontractor will disturb the existing roof while performing these repairs.