Excavate to replace the defective domestic water valve DW-V-40 in H Area near 284-19H. Valve has failed between open and closed. …
Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Replace the tile flooring in the 701-1K Vestibule.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
Collection and disposal of non-hazardous waste and recyclables.…
The Process Computer System (PCS) for the Function Test Station (FTS) is beyond its service life and needs to be replaced. Some of the components a…
Replace packing and unclog drain on cooling water supply pump 004 at 285-H.…
Repair walls, floor and seal roof of Trailers 735-10 and 735-9. Activities will require removal and replacement of damaged wood paneling, wall ins…