This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …
In 108-1L, remove existing instrument air piping valves V-563, V-564, and V-565. Fabricate, hydro test, in-service leak test & install new spool p…
Reroute Domestic Water underground piping around Trailers 704-62S and 704-63S.…
Subcontractor will provide roof repairs at Building 246-2H. The Subcontractor will disturb the existing roof while performing these repairs.…