The DE vessel installed in Room 17 Diffuser System had two of four heater elements fail. In efforts to continue production, the remaining two heate…
The Bonneville Power Administration (BPA) is proposing to perform urgent work on the Sammamish-Maple Valley #1 230kV transmission line between stru…
Bonneville Power Administration (BPA) is proposing to allow Tualatin Soil and Water Conservation District (Tualatin SWCD) to survey for and treat –…
Remove two presumed asbestos containing material (PACM) gaskets from Totalizer at Recovery Well 2 to allow for routine maintenance.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on #2 Service Water Pump.…
Remove insulation from valve in 235-F Steam Station to replace valve. …
"Bonneville Power Administration (BPA) owns and operates the 230 kV Santiam-Albany No. 1 electrical transmission line in Linn County, OR. The transm…
Buildings 14 and 45: replacing the Building 45 and Building 14 (telephone room) chilling systems.…
Replace well water valve WW-V-074 at 285-H.…
782-2G Correct and replace domestic water pressure regulator valve to E-Area PCV-002.…