This activity will modify the chemical feed system and associated concrete containment structures at the 789-B domestic water treatment plant. Rev…
Corrective maintenance activity is required on the 607-46G lift station in order for it to work properly.…
Subcontractor will provide roof replacement at Building 251-F. The Subcontractor “will ” disturb the existing roof while performing this replacemen…
Replace the outboard bearing packing on Pump 004 at 681-3G Pump House.…
Subcontractor will provide roof replacement at Building 717-K. The Subcontractor will disturb the existing roof while performing this replacement o…
Subcontractor will provide roof repairs at Building 763-52N. The Subcontractor will disturb the existing roof while performing these repairs on Bui…
Bonneville Power Administration proposes to fund the Confederated Tribe of Warm Springs, as part of the Columbia Basin Fish Accords, to perform rou…
Southwestern Power Administration proposes an asphalt improvement project to the Springfield Maintenance Facility with new asphalt/baselayer replac…
Western Area Power Administration (WAPA), Rocky Mountain Region, proposes to install approximately 4.5 miles of optical ground wire (OPGW), and per…
On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…