Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
CX(s) Applied: Multiple, Weatherization Assistance Program, Location(s): Multiple, Office(s): Golden Field Office
CH2M HILL Plateau Remediation Company (CHPRC) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with a…
D and R of K-Area Purification Steam Supply Line…
The project would remove and dispose of components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium purifica…
The scope of the Radioactive Materials Laboratory (RML) Ventilation System Replacement Project is to replace all the filter housings and ductwork curr
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
CX-021108: MSC Annual Categorical Exclusion (CX) B1.17, Polychlorinated Biphenyl Removal for CY 2020
The Mission Support Contractor (MSC) and its subcontractors perform removal of asbestos-containing materials from buildings in accordance with appl…
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...