H Canyon's Hot Gang Valve Corridor has piping that is covered with asbestos insulation.…
MSA/HMIS to perform removal of asbestos-containing materials from buildings in accordance with applicable requirements.…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
It has been identified as containing asbestos, and it needs to be removed and replaced.…
This project includes the remodel of Building 920 and the demolition of Building 923. …
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
Floor tiles in the 704-L Lunch Room are loose and broken and need to be removed.…
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
Investigate and upgrade the Idaho Nuclear Technology and Engineering Center (INTEC) fire water distribution system to establish a reliable and adeq…
Removal of all existing HVAC air handling systems throughout the building and the installation of one new packaged air handling unit installed on g…