D and R of K-Area Purification Steam Supply Line…
The project would remove and dispose of components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium purifica…
The scope of the Radioactive Materials Laboratory (RML) Ventilation System Replacement Project is to replace all the filter housings and ductwork curr
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
CX-021108: MSC Annual Categorical Exclusion (CX) B1.17, Polychlorinated Biphenyl Removal for CY 2020
The Mission Support Contractor (MSC) and its subcontractors perform removal of asbestos-containing materials from buildings in accordance with appl…
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
D & R of K-Area Steam Line at 183-2K…
Legacy insulation needs to be removed from Rm 602 in HB-Line. The insulation will be handled as asbestos.…
The scope of the Upgrade to the Environmental Mechanical Test Facility (EMTF) Infrastructure project is to refurbish a portion of the facility...