In support of decontamination and decommissioning (D and D) at the Portsmouth Gaseous Diffusion Plant (PORTS) and the current U.S. Department of Energy (DOE) mission of preparing areas for industrial reuse at PORTS, DOE plans to deactivate, demolish, and disposition two trailer complexes and an asphalt parking lot.
Remove asbestos insulation on steam line at 704-C.…
This project is a continuation of the Building 510 upgrade to the electrical distribution system. This project involves the complete removal and up…
The U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes actions that include on-site waste handling and generation, waste reduction, pollution prevention, property transfer of surplus personal property, and asbestos abatement projects at the Paducah Gaseous Diffusion Plant (PGDP).
Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced. Revision 1 is necessary to includ…
Asbestos remediation work to be performed at Spent Fuel Project controlled facilities in C Area…
Remove all insulation from around the condensate tank at 184-K.…
A small scale asbestos abatement evolution is needed at the 186-C Cooling Water Basin.…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…