In support of decontamination and decommissioning (D and D) at the Portsmouth Gaseous Diffusion Plant (PORTS) and the current U.S. Department of Energy (DOE) mission of preparing areas for industrial reuse at PORTS, DOE plans to deactivate, demolish, and disposition two trailer complexes: the X-151 Contractor Office Trailer Complex and the X-152 Site Operations Management Complex.
The U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes actions that include on-site waste handling and generation, waste reduction, pollution prevention, property transfer of surplus personal property, and asbestos abatement projects at the Paducah Gaseous Diffusion Plant (PGDP).
The U.S. Department of Energy (DOE) plans to deactivate, demolish, and disposition ancillary small structures, piping or equipment, and tanks at the Paducah Site that supported the former uranium enrichment facilities and are aging and/or deteriorated, and no longer needed.
Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced.…
The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
Cleanup asbestos around 784-A.…
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Central Plateau Cleanup Company (CPCCo) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with applica…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform removal of asbestos-containing materials from buildings in accordance…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…