The proposed actions comprise maintenance support services frequently and routinely requested for operational support of DOE facilities and propert…
Mercury Modernization (MM) is a multi-year project that would redevelop a central area of the current Mercury town site to provide modern facilitie…
The purpose of the demolition of Site 50, 52, and 55 houses at Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL, is to reduce excess…
105-C Assembly has some locations inside and outside with damaged transite panels (asbestos containing material). Cleanup is needed.…
Collect and dispose of asbestos containing material at the exterior assembly wall of 105-L.…
Clean up all asbestos debris from cracked window glazing and encapsulate remaining asbestos material in place in L-Area.…
Replace the aging Switchgear and Distribution Panel. Equipment is beyond design life.…
Remove ACM in steam room at 703-A. Remove ACM insulation from steam line and reinsulate with non-asbestos insulation.…
The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
The Assembly side of 105-C has some insulation paneling that is coated with Asbestos Containing Material (ACM) mastic. A few panels have fallen and…