DOE plans to deactivate, demolish, and disposition ancillary structures at the Paducah Site that supported the former uranium enrichment facilities…
The project will be the complete physical demolition of Building 370. Building 370 is approximately 1,127 sq. ft. and was built in 1976.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform removal of asbestoscontaining materials from buildings in accordance …
Central Plateau Cleanup Company (CPCCo) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with applica…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
Remove Approximately 170' of Abandoned Steam Line and the F-Area perimeter fence and associated gates/posts located west of 221-33F.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Air-Conditioning, Heating and Refrigeration Technology Institute…
Replacement of the DFT is required in order to minimize the potential for interruptions to the steam service at KS.
The U.S. Department of Energy (DOE) is proposing to provide funding to the Naval Information Warfare Center (NIWC) Atlantic to install upgrades at …
The new work consists of selective demolition and installing new components to bring the NETL Site Emergency Showers and Eyewashes into compliance …