Central Plateau Cleanup Company (CPCCo) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with applica…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform removal of asbestoscontaining materials from buildings in accordance …
Ownership of the Radiation Research Building, currently owned by the Department of Energy (DOE) and located on the UND campus, would be transferred…
The U.S. Department of Energy (DOE) is proposing to provide funding to the U.S. Office of Personnel Management (OPM) to increase reliability and en…
The U.S. Department of Energy (DOE) proposes to demolish non-Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) facilities and structures remaining at the Oak Ridge National Laboratory (ORNL) and conduct a general...
The system will be upgraded, fully replaced, or enhanced.
The primary purpose of the Building Q3 Dismantlement Project is to remove the existing building to accommodate the construction of a new multi-story office building, along the eastside of the Knolls Laboratory, Building Q3.
The U.S. Department of Energy (DOE) is proposing to provide funding to the U.S. General Services Administration (GSA) to design, construct, commiss…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) authorized by Title IV, Energy Conservation and Product…
The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001