This project includes installation of fencing and underground utilities to establish the proper security controls.
Caulking in a seam between Transite panel(s) and a concrete wall outside of the K-Area MAC Center and Settler Tank is loose and falling out.…
This project would remove and dispose of the components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium pur…
The purpose of the proposed action/project is to upgrade the utility systems identified below in the Proposed Action section.…
The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with applica…
H Canyon's Hot Gang Valve Corridor has piping that is covered with asbestos insulation.…
MSA/HMIS to perform removal of asbestos-containing materials from buildings in accordance with applicable requirements.…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste