The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with applica…
H Canyon's Hot Gang Valve Corridor has piping that is covered with asbestos insulation.…
MSA/HMIS to perform removal of asbestos-containing materials from buildings in accordance with applicable requirements.…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
It has been identified as containing asbestos, and it needs to be removed and replaced.…
This project includes the remodel of Building 920 and the demolition of Building 923. …
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
Floor tiles in the 704-L Lunch Room are loose and broken and need to be removed.…