This tile will be picked up for disposal and the remaining piece of tile that is still attached to the floor will be removed and new tile will be p…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
HMIS Annual Categorical Exclusion (CX) B1.16, Asbestos Removal for CY 2022…
The Kesselring Site Southeast Quadrant Decontamination and Dismantlement Project will remediate, dismantle, and dispose of above and below grade structures and utilities associated with Building 5, Building 5A...
The Kesselring Site Building 11 UHS project consists of multiple phases: 1 b, 2, 3, and 4.
Reinsulate 773-A F-Wing Ductwork…
The Kesselring Site Building 81 Heating, Ventilation and Air Conditioning (HVAC) project consists of replacing the Test, Recording and Monitoring Room, Computer Room, Air Conditioner units, Air Handling Unit (AHU) and Condensing...
Replace Carpet In Room 102, 772-F.…
Remove the 663-33G Handi-House door and door frame that contain asbestos and replace with new asbestos free frame and door.…
294-F is out of service and no longer requires steam.…