Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
Investigate and upgrade the Idaho Nuclear Technology and Engineering Center (INTEC) fire water distribution system to establish a reliable and adeq…
Removal of all existing HVAC air handling systems throughout the building and the installation of one new packaged air handling unit installed on g…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The US Department of Energy (DOE) proposes to modernize and expand the capacity of the LawrenceBerkeley National Laboratory (LBNL) Grizzly Peak Sub…
Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …
Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
CX(s) Applied: Multiple, Weatherization Assistance Program, Location(s): Multiple, Office(s): Golden Field Office
CH2M HILL Plateau Remediation Company (CHPRC) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with a…