It has been identified as containing asbestos, and it needs to be removed and replaced.…
This project includes the remodel of Building 920 and the demolition of Building 923. …
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
Floor tiles in the 704-L Lunch Room are loose and broken and need to be removed.…
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
Investigate and upgrade the Idaho Nuclear Technology and Engineering Center (INTEC) fire water distribution system to establish a reliable and adeq…
Removal of all existing HVAC air handling systems throughout the building and the installation of one new packaged air handling unit installed on g…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The US Department of Energy (DOE) proposes to modernize and expand the capacity of the LawrenceBerkeley National Laboratory (LBNL) Grizzly Peak Sub…
Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …