Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …
Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
CX(s) Applied: Multiple, Weatherization Assistance Program, Location(s): Multiple, Office(s): Golden Field Office
CH2M HILL Plateau Remediation Company (CHPRC) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with a…
D and R of K-Area Purification Steam Supply Line…
The project would remove and dispose of components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium purifica…
The scope of the Radioactive Materials Laboratory (RML) Ventilation System Replacement Project is to replace all the filter housings and ductwork curr
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of the property and subsequent demolition, remova...
CX-021108: MSC Annual Categorical Exclusion (CX) B1.17, Polychlorinated Biphenyl Removal for CY 2020
The Mission Support Contractor (MSC) and its subcontractors perform removal of asbestos-containing materials from buildings in accordance with appl…