A new wireless remote Start/Stop will be installed at M-Area Recovery Wells (RWMs) 2, 3, 4, 5, 6, 7, 8, 10, and 18.…
Three soil borings will be strategically advanced to a depth of 240 feet at the M-Area Hazardous Waste Management Facility: Western Sector In-Situ…
Emulsified zero valent iron (EZVI) will be injected into the subsurface using six fracture/injection points northwest of the M-Area Settling Basin.…
The Saltstone Dust Collectors are to be equipped with pressure relief protection.…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Public Commission of Wisconsin to fund the installation of a backup 50kW…
Install Asphalt Paving for Additional Pads and Sidewalks in Z-Area to the northwest of 210-Z.…
Remove abandoned 115KV lines at SRS, including all wire, poles, hardware, and anchors.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8.…
Blanks will be installed downstream on the outlet valves of third level head tanks (12A, 12B, 13B, and 13C) to prevent solvent from leaking through…
A-786005-HVAC-ACU-1 and A-786005-HVAC-ACU-2 are scheduled for replacement due to age and degradation.…