Partially renovate Room B-065/B-067 to install a Thermal Ionization Mass Spectrometer (TIMS) in the new Ultra High Sensitivity Isotopic Analysis Fa…
The U.S. Department of Energy (DOE) is proposing to provide funding to SkyNRG Americas to complete baseline verification of a conversion pathway th…
The U.S. Department of Energy (DOE) is proposing to provide funding to Cummins Electrified Power NA Inc. (Cummins) to design, fabricate, install an…
Replace B16 roof and install french drain on the North and West sides of the building.…
This activity is for completing deactivation of the 236-H By-Product Facility.…
All activities pertain to the addition, removal or replacement of equipment located in Diffuser (DI) Glovebox T105-301-1, Cabinet 2, in Room 17 ofB…
In order to evaluate and enhance Pu down-blend processing/efficiencies, solid powder-like materials testing and test location(s) will be installed …
Install a Pressure Monitoring/ Relief Stations for legacy portable Z-Beds (aka Torpedoes) in the Tritium Facilities per M-DCF-H-13743.…
The existing water heater in Room 121 is being replaced with a similar model.…