Run copper cable from 719-5N to 704-199N.…
Air gap building propane system to Section C Lab Modules per M-DCF-A-01420 and WO 01891511.…
Fabricate and install crossover ramps on the roof of Building 221-F at expansion joints.…
Enhancements to be done in 704-K via removal of wallpaper from certain building hallways/corridors where needed, and applying paint, etc.…
Subcontractor will provide roof repairs to K-Area 918 Fan.…
Additional FEDNET Communications Data Drops will be installed in 105-K.…
Upgrade fire detection and alarm system in Building 704-K.…
Remove the south rail stop from the 105-L transfer bay area.…
Seal the near side handball court, 191-L access plugs and entry hatch cover to prevent water intrusion into the building.…
Remove and replace insulation on steam lines in L-Area.…