Subcontractor will provide roof repairs at 702-A.…
As part of the 288-F Ash Basin Landfill Reclamation Project, this activity will involve an annual relocation of approximately 3,800 cubic yards (2,…
Remove 282-H switchgear from service, air gap 13.8kV feeds, D and R 282-H structure.…
The operation of Tuttnauer Model 2840ELP Benchtop Autoclave for the steam sterilization of dry and liquid material in support of biological R and D…
The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…
Replace MPC Crane High Pressure Sodium (HPS) Light with LED Lights.…
Identify the location of the caustic line leak at 211-H and perform necessary repairs.…
714-2N Replace carpet and paint.…
The disposal site would continue to be visually inspected on an annual basis…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Electric Power Research Institute, Inc. (EPRI) to improve the reliabilit…