New office trailers are to be installed in G-Area to support Savannah River Remediation personnel.…
A Process Air pressure reducing station to operate pneumatic tools will be installed in the Saltstone Facility Process Room.…
The Saltstone Facility Bulk Material Handling (BMH) system is experiencing issues with the butterfly and knife gate valves.…
Install pipe support on 782-A bypass.…
Install new CAT 5 wiring at 66 drops in 703-1B.…
766-H Room 1029 Remove Carpet, Ceiling Tiles, and Wallpaper…
Remove the worn above ground drain pipe components of the GS level scupper drain pipe systems and replace them with similar new components.…
The subcontractor shall replace wooden line ties from the railroad bed, identified by site transportation and engineering as part of the 2022 scope…
Site Construction services to perform 703-41A building improvements.…
Vacuum pump oil change at 999-1W.…