The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the Big Eddy-Ostrander No.1, Knight-Ost…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access for Marine Energy Research (TEAMER) program.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Ventura Energy Partners for the design and installation of a battery energy storage system (BESS) at the Forks of Butte Hydroelectric Generating Facility in Magalia, California.
KEM Electric Cooperative plans to replace protective devices within existing substation fences and at existing wood pole locations in existing util…
Bonneville Power Administration (BPA) proposes to acquire a revenue meter that was previously installed by Benton County Public Utility District No…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to address non-recurring …
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warms Springs Reservation of Oregon (CTWS) to remove western …
Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
Disassemble and Remove UPS System and repair sheetrock in 702-F. The UPS battery system is no longer in use, and it needs to be removed from 702-F.…