Categorical Exclusion (CX) Determinations By Date

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Ventura Energy Partners for the design and installation of a battery energy storage system (BESS) at the Forks of Butte Hydroelectric Generating Facility in Magalia, California.