The Klickitat PUD will upgrade approximately 8,500 feet of old, outdated single phase distribution line to three phase line. These upgrades include…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Site work to prep area for substation construction, including grading, stormwater, erosion control, material import, and compaction, ground grid in…
Revision to: EC-A-2022-0001. Entry into new EEC database and extended activity end date until 2028…
CX-034032: Pick-Sloan Missouri Basin Program - Eastern Division (P-SMBP-ED): Rate Order No. WAPA-218
WAPA-UGP is proposing to use new formula-based methodology for UGP’s rate implementation and annual update procedures with changes related to the p…
Bonneville Power Administration (BPA) is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locat…
The U.S. Department of Energy (DOE) is proposing to provide funding to three Community Sparking Investments in Transformative Energy (C-SITE) grant…