LM is proposing to amend Categorical Exclusion Evaluation (CXE) Form LM 11-21 to conduct project-specific safeguarding activities at fourteen open …
This new CX determination has been signed due to the addition of project locations for additional EV charger installation activities. …
This new CX determination has been signed due to the addition of project locations for additional EV charger installation activities. …
Bonneville Power Administration (BPA) proposes to provide funds to the Columbia Conservation District (CCD) for restoration activities to increase …
Bonneville Power Administration (BPA) proposes to adopt the Public Rates Design Methodology (PRDM), which establishes BPA's method for developing …
This project addresses telecommunications, power, and HVAC for the relocation of the existing ATR Complex TRA-614 dial room to a new facility.…
DOE-LM is proposing to conduct routine inspections, groundwater and surface water monitoring, and routine maintenance activities at the Green River…
Virtual Pipeline Ventures, LLC (VP Ventures) filed an application with DOE's Office of Fossil Energy and Carbon Management (FECM) on April 3, 2025, seeking long-term authorization to export domestically produced liquefied natural gas (LNG). DOE's proposed action is to authorize the exports described in the Application as small-scale natural gas exports.
Historic or legacy fuel from EBR-II as well as additional historic fuels currently stored in the HFEF hot cell consist of metallic nuclear fuel at …
DOE's Office of Fossil Energy and Carbon is proposing to amend Order 5292 to allow three additional years for PALNG Phase II to export any of the total approved volume of LNG that it is unable to export by December 31, 2050.