Categorical Exclusion (CX) Determinations By Date

Funding will support the project team's small-scale research and development of a technology approach to large-scale, dynamic energy transport by using electrochemical processes and existing logistics infrastructure by leveraging globally abundant, non-critical metals to serve as energy carriers and innovative metal-air fuel cells and low temperature metal electrolyzers for energy conversion.
The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.