The Savannah River Site Forest (SRSF) plan to install five portable building trailers, for use by SRSF.…
Replace split and package units AT 751-1A. The units are old and need replacing.…
Paint piping, metal risers, and pipe support around 785-2A.…
This EEC covers the building of a new room for B-level storage in 713-N.…
The project will be targeting poles that are currently over 50 years old and have a transformer. In addition, priority will be placed on transforme…
On June 8, 2025, the Fermilab Fire Department (FFD) was dispatched to Lab A for an Automatic Fire Alarm (AFA). Upon investigation, crews discovered…
Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5…
Funding will support the project team's small-scale research and development of a technology approach to large-scale, dynamic energy transport by using electrochemical processes and existing logistics infrastructure by leveraging globally abundant, non-critical metals to serve as energy carriers and innovative metal-air fuel cells and low temperature metal electrolyzers for energy conversion.
The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.