Grid Resiliency project with new solid dielectric vacuum reclosers, capacitor bank, electronic controls/communications, air insulated switchgear an…
Paint F-Area steam pole brackets.…
Western Area Power Administration (WAPA), Rocky Mountain (RM) region proposes new formula rates for the Loveland Area Projects (LAP) transmission a…
1. Install new substation conduit and manhole system for 13kv distribution. 2. Install new conduit and manhole system for 13kv distribution. 3. En…
The Assembly side of 105-C has some insulation paneling that is coated with Asbestos Containing Material (ACM) mastic. A few panels have fallen and…
The original grease trap for 766-H is damaged and leaking gray water from the kitchen into the subsurface below. The damaged grease trap will be re…
CM 4493 Install light under awning weld test at 711-2N. Install supports for new LED fixtures and conduit under awning in 711-2N. Install new LED f…
This EEC covers the installation of the Amada Marvel (SA460WPC) band saw and conveyors at 717-1N.…
This treatability study will evaluate tetraphenylborate destruction in Tank 48H samples after treatment with permanganate.…
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife (ODFW) to replace fish screens at two sites (Cath…