Clear stumps around the Building 709-7G, grade area, and seed.…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
Venture Global CP2 LNG, LLC (CP2 LNG) filed an application (Application) with the Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) on December 2, 2021.
An underground storage tank was discovered near Site 12 during excavation for the Kautz Road Construction Entrance. The contents of the tank were s…
Upgrading mining site to 3-phase power. Upgrading along existing overhead lines and adding a transmission pole. Installation of a meter and transfo…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Noria Energy Holdings, LLC (Noria) to hybridize floating photovoltaics (FPV) with hydropower to improve hydropower flexibility.
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Ava Community Energy Authority to install a photovoltaic solar array and Battery Energy Storage System (BESS) microgrid ("solar + storage") at the Age Well Center South Fremont ("Age Well Center"; Fremont, CA).
A series of three culverts on Giese Road will be replaced due to structural concerns and to improve the flow of Indian Creek. The existing roadway…
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the Broadview-Garrison No. 1 and No. 2 …
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the Chief Joseph-Monroe No 1 and Chief …