This project will rebuild a 1950's transmission and distribution line with modern materials, upgrading the poles, shortening spans, and upgrading t…
Project involves the replacement of existing utility poles and lines and addition of technologies to provide resiliency.…
The proposed action permanently closes seven regulated Underground Storage Tanks (UST) and one non-regulated UST at the Central Facilities Area (CF…
Bonneville Power Administration (BPA) proposes to fund the Wild Fish Conservancy (WFC) project to prepare media materials for the Pacific Lamprey C…
Bonneville Power Administration (BPA) proposes to fund the Shoshone-Bannock Tribes to replace an undersized culvert at the crossing of Sheepskin Ro…
Install Road from S-Area to 299-H through CIF (607-35H) gates.…
Replace 24" MOV hardware at 681-3G.…
This task will involve the fabrication and testing of glasses containing depleted U3O8 and ThO2.…
Operation of a six-axis robotic AM system in 723-15A.…
The Chemical Flowsheet Development (CFD) personnel will conduct laboratory scale simulations of the Defense Waste Processing Facility (DWPF) proces…