This Amended Determination follows the approval of additional funds, project tasks, and extended period of performance to finalize the development …
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to deploy and operate equipment for the purpose of renewable ener…
The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
Road G Milling, Paving, and Striping.…
These work instructions are to safely changeout the leaky eyewash bowl and components for the permanent Eyewash/Safety Shower located at 717-5N.…
Remove and dispose of the existing asphalt in the IRC 602 West Parking Lot and IRC 605 Laydown Yard, install 9 light poles in IRC 602 West Parking …
A new seismic station is proposed to be installed near the CITRIC site. This new seismic station would include a “seismic vault” which consists of …
Westinghouse Electric Company, LLC (WEC) and Idaho National Laboratory (INL) will collaborate on this project in the irradiation, post- irradiation…
Install combined battery and heat pump systems, with additional smart thermostats installed where appropriate, in LMI occupied homes. These devices…
A caustic leak has been identified near column 57. Removal and installation of asbestos insulation is required for this repair.…