Remove ACM in steam room at 703-A. Remove ACM insulation from steam line and reinsulate with non-asbestos insulation.…
Replace a failing 42-inch corrugated metal pipe (CMP) located at the southeastern side of 730-4B building with a 42-inch class III reinforced concr…
Spent Material Clean-up within the 725-1N Abrasive Blasting Operations Area and Minor Maintenance of Silt Fence…
Roof replacement of multiple roofs on 105-K - Disassembly area, Personnel bldg., Purification areas, Stack area, 911 Fan Room, and Final Storage Ar…
OBU-H-2019-0454, Rev. 1: EEC revised to extend the project end date to 2026. The existing Seismic Detection Subsystem and a Tritium Confinement Sub…
Bonneville Power Administration (BPA) proposes to replace insulators, remedy impairments and improve access roads in multiple locations along the C…
The proposed project is broken into two parts, with the first part covering reconductoring and reconstruction of a single-phase line serving the po…
Replace overhead power line with underground cable within existing easements. …
Electrical device upgrade and replacement (over-current reclosers and communcation base stations).…
Electrical device upgrade and replacement.…