Building 723-15A will be converted to Vault Type Rooms (VTR).
Residual sample material from on-site facilities and/or applicable customers will be dispositioned using the SRNL's HAD system once analytical char…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
The Jumpstart Opportunities to Unleash Leadership in Energy Storage with 1K Energy Storage Systems (JOULES-1K) Phase 2 Program (previously Pioneering Railroad, Oceanic and Plane ELectrification with 1K energy storage systems [PROPEL-1K]) consists of projects chosen from Phase 1 of the JOULES-1K program which show the most promise of developing novel energy storage to support drones, robots, Electrical Vertical Take-Off and Landing (eVTOL) aircraft, and other applications that would benefit from ultra-high-density storage systems.
This Amended Determination follows the approval of additional funding, an extended period of performance, and new project milestones to support the project team's small-scale research and development activities of an autonomous laboratory platform, "AlloyBot," intended to develop new structural alloys for energy and propulsion technologies with extreme operating conditions.
Six 15KWh LFP batteries and an energy management system will be installed at the FIGR farm property which is considered critical infrastructure by …
The objective is to conceptualize hybrid power systems technology, simulate such concepts experimentally, and analyze their steady and transient re…
POWPOW, Inc. DBA Texas TEA Fuels and Lubes (Applicant) filed an application (Application) with the Department of Energy's (DOE) Hydrocarbons and Geothermal Energy Office (HGEO) on February 2, 2026, pursuant to section 3 of the Natural Gas Act (NGA) and 10 CFR Part 590 of DOE's regulations.
Navergy Infrastructure Partners LLC (Navergy) filed an application (Application) with the Department of Energy's (DOE) Hydrocarbons and Geothermal Energy Office (HGEO) on February 9, 2026, and Navergy filed a supplement to the Application on April 28, 2026.