Clinica Family Health and Wellness will install battery energy storage system (BESS) at its Pecos Medical and Dental Clinic. The battery is a 60 kW…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install optical ground wire (OPGW) and to replace existing wood …
Replace microscope feedthrough on glovebox in 773A- Lab C-059…
Replace flooring in room No. 1 in 703-1B.…
The HVAC unit, curb, and associated ducting will be replaced (by Centerra request) due to issues stemming from errors made during the previous inst…
This project is for building an office inside of room 210 of building 704-4N.…
The dip tube bubblers in the 511-S Recycle Waste Tank are being replaced with wide mouth bubblers to prevent future clogging of the bubblers.…
The SRS Liquid Waste contractor sends routine characterization samples from the H-area and F-area Tank Farms to the Savannah River National Laborat…
EEC for rheometers that use NIST traceable oil standards for verifying the functionality of the instruments. These standards are silicon-based oils…
In this SRS Tank Farm supernatant liquid (radioactive waste) mercury characterization study, the goal is to sequester total mercury/ionic mercury i…